Report · Q4 2026
Humanoid robot deliveries: what has actually shipped
Of 14 dated public promises by humanoid robot makers that fell due before November 2026, 1 is documented as kept in full: 7 were missed, 4 were kept in part and 2 remain unconfirmed.
Key figures
due promises is documented as kept in full
Every dated promise in the dataset whose deadline passed by October 2026. Not a sample.
missed
Deadline passed, failure documented or no sign of delivery.
kept in part
Something shipped, but not the promised scale or date.
unconfirmed
Deadline passed, no confirming source found.
deployments are production
39 are pilots.
Announced versus delivered
The 14 promises that fell due
Each row gives the promise, the deadline, the outcome and the sources for both. Sorted by outcome, then by deadline.
- Kept 1
- Partly kept 4
- Missed 7
- Unconfirmed 2
| Robot | Promise | Due | Outcome | What we found | Sources |
|---|---|---|---|---|---|
| UBTECH Walker S1UBTECH Robotics | “500 to 1,000 Walker S-series units produced and delivered by end of 2025”UBTECH | Dec 2025 | Kept | UBTECH's 2025 annual results (HKEX, 31 March 2026): full-size humanoid robots 'achieved sales volume of 1,079 units' in 2025. The filing does not break the figure down by model; the Walker S series is UBTECH's industrial full-size line. | e.vnexpress.netwww1.hkexnews.hk |
| K-Scale K-BotK-Scale Labs | “Ship K-Bot to the first 100 Founder's Edition customers at USD 8,999”K-Scale Labs | 2025 | Partly kept | First units delivered 2025-09-26; remaining pre-orders cancelled and refunded in November 2025. | ai.engineerhumanoidsdaily.com |
| Dobot AtomDobot Robotics (Shenzhen Yuejiang Technology) | “Mass production of Atom by mid-2025”Dobot Robotics | Jun 2025 | Partly kept | First batch delivered in June 2025 (Nagoya) and 'mass production' announced in early 2026; no volumes ever stated. | scmp.comrockingrobots.com |
| EngineAI T800EngineAI Robotics (Shenzhen EngineAI Robotics Technology) | “First T800 shipments no later than 2026-06-02”EngineAI | Jun 2026 | Partly kept | First batch announced off the line in late May; no customer receipt or unit count confirmed. | humanoidsdaily.comaustralianmanufacturing.com.au |
| Robot Era STAR1 / L7Robot Era (Robotera; Beijing Xingdong Jiyuan) | “Begin deliveries of 1,000 humanoids to logistics centers in Q2 2026 (Caixin summary says 'thousands of units')”Robot Era (company statement via Dr. Web / Caixin summary) | Jun 2026 | Partly kept | Deliveries began: Robot Era's press release of 8 May 2026 says 'In Q2 2026, ROBOTERA initiated thousand-unit deliveries'. No source confirms how many of the 1,000 have been delivered; deployments are reported at more than ten logistics centres of China Post and SF Group. | drweb.deen.prnasia.com |
| Fourier GR-3Fourier (formerly Fourier Intelligence) | “GR-1 mass production in late 2023, thousands of units in 2024”Fourier | Dec 2024 | Missed | Plan confirmed by Wikipedia ('Plans were made to begin mass production by the end of 2023 and to deliver thousands of units in 2024'). In October 2024 KrASIA reported for the GR-1, launched in 2023: 'Over 100 units have since been delivered'. No later source reports thousands. | en.wikipedia.orgkr-asia.com |
| Leju KuavoLeju Robot (Leju Intelligence (Shenzhen) Co., Ltd.) | “About 1,000 Kuavo units delivered in 2025”Leju Robot | Dec 2025 | Missed | Prospectus shows 577 Kuavo units sold in 2025. | en.wikipedia.orgtmtpost.com |
| Tesla OptimusTesla, Inc. | “Tesla builds about 5,000-10,000 Optimus in 2025 and several thousand do useful work in Tesla factories by end of 2025.”Elon Musk | Dec 2025 | Missed | Per reporting, only hundreds to about 1,000 built in 2025 and production was paused mid-2025; in January 2026 Musk reportedly conceded no robots were doing useful work. | electrek.coelectrek.co |
| Agile ONEAgile Robots SE | “Series production of Agile ONE in Bavaria from early 2026”Agile Robots | Mar 2026 | Missed | No confirmation of series production found; in 2026-10 the stated production start for ONE S/SN is 'by end of 2026'. Judged from absence of evidence, not from an announced delay. | agile-robots.comtechnode.com |
| Tesla OptimusTesla, Inc. | “Unveil Optimus V3 in Q1 2026.”Elon Musk | Mar 2026 | Missed | Moved to 'closer to production start' in April 2026; no public V3 unveiling confirmed in the sources reviewed as of late September 2026 (not confirmed after the Q3 2026 call). | humanoidsdaily.comelectrek.co |
| NEURA 4NE1 MiniNEURA Robotics | “4NE1 Mini deliveries from April 2026 (page then said 'Spring 2026').”NEURA Robotics | Apr 2026 | Missed | Product page in October 2026 says 'expected to be available in 2026'; no shipments confirmed. | originofbots.comneura-robotics.com |
| Tesla OptimusTesla, Inc. | “V3 reveal around mid-2026.”Elon Musk | Jul 2026 | Missed | As of 2026-09-25 the demo had not happened (Electrek). | finance.yahoo.comelectrek.co |
| Noetix N2Noetix Robotics | “Complete deliveries of first 1,000-unit overseas order in Q2 2026”Noetix Robotics | Jun 2026 | Unconfirmed | No delivery confirmation found; reports conflict on whether the order is for the N2 or the Bumi. | autonews.gasgoo.com |
| AgiBot G2AgiBot (Zhiyuan Robotics) | “AgiBot plans to expand G2 deployment at Longcheer to 100 robots by Q3 2026”AgiBot (via press reports) | Sep 2026 | Unconfirmed | Due 2026-09 has passed; no confirmation that 100 G2 are running at Longcheer. Latest report found (ai2.work, 2026-06-08) calls the initial deployment 'a handful of units'. Unconfirmed and overdue. | agibot.com |
Promise and outcome come from the sources in the row, mostly manufacturer statements and trade press. “Unconfirmed” means we found no confirmation, not that nothing shipped.
The market in numbers
What can be bought today, and where robots work
26 of 60 robots can be bought or pre-ordered in at least one of the three markets. 15 of them come from makers based in China.
Status by market
- Buy now
- Pre-order
- B2B only
- Prototype
- Discontinued
- Not available
Price of the cheapest offer
Maker country
Type of deployment
Method
How the number is built, and what it does not say
Data as of: Nov 24, 2026. Edition Q4 2026. The basis is the 60 robot files of the dataset (last review Nov 1, 2026). Every figure on this page is computed from those files when the page is built.
Promise: a dated public commitment by a maker, its CEO or a named partner that something will ship, be built, be shown or be deployed by a given date. We only record commitments that have a source and a deadline.
Due: the deadline falls before November 2026. A bare year counts as due only once the year is over. Commitments without a deadline are not counted. Of 63 recorded promises, 14 are due.
Outcome: kept only if a source confirms fulfilment. Partly kept if something shipped, but not the promised scale or date. Missed if the deadline passed unfulfilled and a source supports that; in 1 of the 7 the verdict rests on missing proof of delivery, and the note in the table says so. Unconfirmed if we found no confirming source after the deadline.
Limits
- The selection of promises is ours. The dataset holds public, dated, checkable commitments, not every remark. A different selection could give a different ratio. The 14 are, however, all due promises in the dataset, not a sample of them.
- Evidence of delivery mostly comes from the makers themselves or from trade press. Independently audited unit counts are rare.
- “Not documented as kept” does not mean “nothing shipped”. Several makers do deliver, only fewer or later than announced.
- Two of the Tesla promises concern an unveiling, not a delivery. They are counted because the deadline was public.
Check the numbers
The rows are available as CSV and JSON under CC BY 4.0 (the column due_before_2026_11 marks the due ones). The robot list is available as CSV and JSON. The headline figure was also recounted independently with a separate script and by a second checker who had not seen our page; both arrived at the same 14, 1, 7, 4 and 2.
Found a mistake? Write to the address in the legal notice, with a source. We add corrections with a date.
Corrections
- Nov 24, 2026: UBTECH Walker S: unconfirmed → kept (annual results 2025: 1,079 full-size humanoids sold). Robot Era: unconfirmed → kept in part (deliveries began in Q2 2026, count unconfirmed). Unitree H2: removed, the date came from a dealer, not from the maker. Fourier: verdict now backed by a delivery figure (over 100 GR-1 by October 2024). Before: 15 due, 0 kept, 3 in part, 7 missed, 5 unconfirmed.
CC BY 4.0
Cite and reuse
The figures, table and charts may be reused freely, commercially too. Please link to this page.
The finding as a quote
Of 14 dated public promises by humanoid robot makers that fell due before November 2026, 1 is documented as kept in full: 7 were missed, 4 were kept in part and 2 remain unconfirmed. Source: The Humanoid Report, https://www.thehumanoid.report/reports/humanoid-deliveries-q4-2026/ (CC BY 4.0), data as of Nov 24, 2026.
Reference
The Humanoid Report (2026): Humanoid robot deliveries: what has actually shipped. Q4 2026 edition, data as of Nov 24, 2026. CC BY 4.0. https://www.thehumanoid.report/reports/humanoid-deliveries-q4-2026/
Link for the web
<a href="https://www.thehumanoid.report/reports/humanoid-deliveries-q4-2026/">The Humanoid Report</a>
Editors with questions can reach us via the Legal notice. Next: Promises · Deployments · Buy